Pasco County Pool Permits: What the Application Requires

Who issues a pool permit in Pasco County, what the pool checklist and safety affidavit ask for, and when a Notice of Commencement and inspections apply.

By Pool Pros (CPC1461047) · October 19, 2026 · Homeowner Resources

Yes. A pool in unincorporated Pasco County, including Wesley Chapel, is permitted by Pasco County Building Construction Services, while Dade City, Zephyrhills and New Port Richey run their own building departments. Pasco's checklist asks for signed and sealed plans, a detailed site plan, a drainage plan, a notarized pool safety affidavit and, over $5,000, a recorded Notice of Commencement.

A Pasco pool permit starts with a question that has nothing to do with the pool: whose permit is it? The answer decides the portal, the checklist and the review clock.

Do you need a permit to build a pool in Pasco County?

Yes. Pasco County’s residential pool and spa permit package covers “new construction or renovation for all in-ground and above-ground pools,” and lists in-ground concrete pools among its types of work. Pasco’s Land Development Code also regulates private pools directly in section 530.4, which sets where a pool can sit and how the pool must be enclosed.

Which office issues the pool permit: Pasco County or a city?

Pasco County has six incorporated municipalities, according to the Pasco County Supervisor of Elections: Dade City, New Port Richey, Port Richey, San Antonio, Saint Leo and Zephyrhills. Outside those limits is unincorporated Pasco, where Pasco County Building Construction Services issues the permit. Wesley Chapel is not one of the six, so a pool in Wesley Chapel is a county permit unless the parcel sits inside a city. Land O’ Lakes, ZIP codes 34637, 34638 and 34639, is not one of them either.

Wesley Chapel’s ZIP codes are 33543, 33544 and 33545, and the Zephyrhills post office delivers 33543 and 33544, which is why some records attach the Zephyrhills name. The permit follows the parcel, not the post office. The new-home side of this is covered in adding a pool to a new Wesley Chapel or Land O’ Lakes home.

Where the parcel is Permitting office How to apply Published timing
Unincorporated Pasco, including Wesley Chapel Pasco County Building Construction Services PascoGateway; all documents electronic Notice of issues within 10 business days of plan upload
City of Dade City Dade City Building Department Citizen Portal (iWorq); digital submissions preferred Review time of 4 to 6 weeks
City of Zephyrhills Zephyrhills Building/Code Enforcement Department Through the city None found
City of New Port Richey Building Division at City Hall Through the city None found

Inside Dade City limits, the city’s own in-ground pool list includes a Tampa Electric power approval letter, a safety barrier affidavit, signed and sealed engineered plans, a copy of the contract or proposal and a Notice of Commencement.

Who permits a pool in San Antonio, Saint Leo and Lake Jovita?

San Antonio and Saint Leo work differently: each city approves the application first, and the Dade City building department then issues the permit under a local agreement, as laid out in who permits a pool in San Antonio, Saint Leo and Dade City.

A Dade City mailing address is not proof of city limits either: the Lake Jovita Golf and Country Club has one, and the US Census Geocoder places it in unincorporated Pasco. Port Richey is worth confirming with the city directly.

What does Pasco County’s pool application require?

Pasco County’s current checklist, Permit Submittal Requirements for Residential Pool and Spa, says every document must be submitted electronically. On a Pool Pros build, engineers draw these plans and Pool Pros manages the submittal. The core set:

  • An ANSI form.
  • Construction plans digitally signed by a Florida-licensed professional engineer or registered architect, designed to the current Florida Building Code.
  • The Pool/Spa Safety Act form.
  • A site plan.
  • A drainage plan. Pasco says a copy of an approved drainage plan can be requested by email where one is available.

The site plan has to show:

  • The pool, spa and deck in relation to the house, accessory structures and lanai foundations, with lights, main drains, sun shelf, swim-outs and depths.
  • Corner deck elevations and the home’s finished floor elevation.
  • Equipment location with dimensions and setbacks.
  • Property lines, setbacks to property lines and structures, and easements with dimensions.
  • Wetlands, flood zone lines and, on waterfront lots, setbacks to the mean high water line.

The plans add a complete plumbing layout, every window and door with access to the pool, and the child barrier fence where one is used. An owner-builder adds a notarized disclosure statement. In a special flood hazard area, plans must meet the Florida Building Code and ASCE 24-14.

Why do Pasco pool applications get sent back?

Pasco County’s checklist names its common reasons for disapproval: plans not dimensioned, plans not signed and sealed, contractor information not current in the system, missing owner information, and revisions submitted without a narrative of what changed. Every item on that list is paperwork, which makes every item avoidable.

What does Pasco’s pool safety affidavit commit you to?

Pasco’s affidavit is titled “Residential Swimming Pool, Spa, and/or Hot Tub Safety Act Notice of Requirements,” and the owner or contractor signs it before a notary. The signer initials the method that will satisfy chapter 515, Florida Statutes. The choices track section 515.27, compared in pool alarms, safety covers and door alarms compared.

Pasco adds a county rule on top. Land Development Code section 530.4(D) requires a pool to be “walled, fenced, or enclosed so as to prevent uncontrolled access from the street or adjacent property,” with a barrier at least four feet high. The affidavit writes its alarm and door options around that enclosure, and the signer agrees that one of three enclosures will be complete before final inspection:

  1. A fence at least four feet high with self-closing, self-latching gates.
  2. A screen enclosure with self-closing, self-latching screen doors, latches at least 54 inches above the exterior standing surface.
  3. An ASTM F1346-91 safety cover that can be securely fastened over the pool when not in use.

The affidavit also states that all screen enclosures require building permits. The state barrier rules behind all of this are in Florida’s pool barrier law explained.

When does a pool need a Notice of Commencement?

Section 713.13, Florida Statutes, requires an owner to record a notice of commencement with the clerk before starting an improvement, and to post a certified copy or a notarized statement at the site. Section 713.02(5) states that an improvement with a direct contract price of $2,500 or less is exempt. The owner must sign the notice personally.

Section 713.135 sets the permit-side trigger. The building department must require a copy of the notice before the first inspection when the direct contract is greater than $5,000, and may not perform or approve later inspections until the copy is filed. Pasco County’s pool checklist uses the same line, asking for a notarized notice recorded with the Clerk of Courts when a project is over $5,000. A notice is void if work does not begin within 90 days of recording.

What inspections does a Pasco pool go through?

The Florida Building Code leaves timing and sequence to the building official, but the pool entry in section 110.3 of the Building volume names two inspections:

  1. A first inspection after excavation, with reinforcing steel, bonding and the main drain installed, before concrete is placed.
  2. A final inspection when the pool is complete and all required enclosure requirements are in place.

Section R4501.19 of the Residential volume adds that final electrical and barrier inspections come before the pool is filled, with vinyl liner and fiberglass pools as the stated exception. In unincorporated Pasco, inspections are requested through PascoGateway, and Pasco County states that a building permit is valid for 6 months from issue and 6 months from the last passed inspection.

Where does the permit fit in a Pool Pros build?

Engineering and permitting are step two of the Pool Pros build process, after design. Pool Pros Construction’s process page puts most builds at about 8 weeks once HOA approval and permits are complete, depending on design complexity, weather and material availability. On a sandy lot, a gopher tortoise burrow is a separate state permit question the county checklist does not mention, covered in gopher tortoise burrows and the FWC permit.

Pool shell mid-construction with rebar and wooden forming stakes in place, no water yet.
Pool shell mid-construction with rebar and wooden forming stakes in place, no water yet.

References

Sources cited in this article:

Ready to talk about your own pool?

Tell us about the space you have and the pool you're picturing — we'll take it from there.